Bring the court back into play.

Hard-surface tennis, netball and volleyball court refurbishment focused on repair, traction, weather resistance and clear markings.

Court refurbishment

Repair the base. Rebuild the playing surface.

Iron to Earth’s current service is focused on resurfacing existing hard courts rather than pretending every project starts from scratch.

  • Crack repair compounds
  • Primer and sealer preparation
  • Acrylic sport coating systems
  • Textured top coats for grip
  • UV-stabilised colour systems
  • Restored court markings
TENNISNETBALLVOLLEYBALL
Refurbishment logic

A court is a system, not a paint job.

1

Inspect cracking & wear

Review the existing concrete/asphalt surface, cracks, coating adhesion, drainage indicators and high-wear zones.

2

Prepare & repair

Address cracking and surface defects, then prepare and prime the substrate for the coating system.

3

Resurface & texture

Apply the sport coating and textured top coat selected for weather durability, traction and presentation.

4

Mark & return to play

Restore clear lines and discuss curing / return-to-use requirements for the chosen materials.

The current Iron to Earth site says a professionally resurfaced court may last 5–8 years depending on usage, environment and maintenance. Actual lifespan varies by project conditions and system.
School, club or private court?

Start with the court condition.

Send wide photos, crack close-ups, approximate dimensions and the sport(s) played.

WA